Description of the main production process of large-diameter straight seam welded pipe:
-
01
Plate inspection: After the steel plate used to manufacture the large-diameter submerged arc welded straight seam steel pipe enters the production line, the full plate ultrasonic inspection is first carried out;
-
02
Edge milling: double-sided milling of the two edges of the steel plate by a milling machine to achieve the required plate width, plate edge parallelism and bevel shape;
-
03
Pre-bending: Use a pre-bending machine to pre-bend the edge of the board so that the edge of the board has a curvature that meets the requirements;
-
04
Forming: On the JCO forming machine, first half of the pre-bent steel plate is pressed into a "J" shape through multiple stepping steps, and then the other half of the steel plate is also bent and pressed into a "C" shape, and finally an opening is formed "O" shape
-
05
Pre-welding: Join the formed longitudinally welded steel pipes and use gas shielded welding (MAG) for continuous welding;
-
06
Internal welding: use longitudinal multi-wire submerged arc welding (up to four wires) to weld on the inner side of the straight seam steel pipe;
-
07
External welding: use longitudinal multi-wire submerged arc welding to weld on the outside of the longitudinal submerged arc welded steel pipe;
-
08
Ultrasonic inspection I: 100% inspection of the inner and outer welds of the longitudinally welded steel pipe and the base materials on both sides of the weld;
-
09
X-ray inspection I: 100% X-ray industrial television inspection of the inner and outer welds, using an image processing system to ensure the sensitivity of flaw detection;
-
10
Diameter expansion: expand the total length of the submerged arc welded straight seam steel pipe to improve the dimensional accuracy of the steel pipe and improve the distribution of the internal stress of the steel pipe;
-
11
Hydraulic test: The expanded steel pipes are inspected one by one on the hydraulic testing machine to ensure that the steel pipe meets the test pressure required by the standard. The machine has automatic recording and storage functions;
-
12
Chamfering: Process the pipe end of the qualified steel pipe to meet the required pipe end groove size;
-
13
Ultrasonic inspection Ⅱ: Perform ultrasonic inspection again one by one to check the possible defects of the longitudinally welded steel pipe after the diameter expansion and water pressure;
-
14
X-ray inspection Ⅱ: X-ray industrial television inspection and filming of pipe end welds on the steel pipe after the expansion and hydraulic test;
-
15
Tube end magnetic particle inspection: carry out this inspection to find tube end defects;
-
16
Anti-corrosion and coating: Qualified steel pipes are anti-corrosion and coating according to user requirements.
UOE LSAW Pipes
|
Outside Diameter |
Φ508mm- 1118mm (20"- 44") |
|
Wall Thickness |
6.0-25.4mm 1/4"-1" |
|
Length |
9-12.3m (30'- 40') |
|
Quality Standards |
API、DNV、ISO、DEP、EN、ASTM、DIN、BS、JIS、GB、CSA |
|
Grades |
API 5L A-X90,GB/T9711 L190-L625 |
JCOE LSAW Pipes
|
Outside Diameter |
Φ406mm- 1626mm (16" - 64" ) |
|
Wall Thickness |
6.0- 75mm (1/4" - 3" ) |
|
Length |
3-12.5m ( 10'- 41' ) |
|
Quality Standards |
API、DNV、ISO、DEP、EN、ASTM、DIN、BS、JIS、GB、CSA |
|
Grades |
API 5L A-X100, GB/T9711 L190-L690 |
Tolerance of Outside Diameter and Wall Thickness
|
Types |
Standard |
|||||
|
SY/T5040-2000 |
SY/T5037-2000 |
SY/T9711.1-1977 |
ASTM A252 |
AWWA C200-97 |
API 5L PSL1 |
|
|
OD deviation |
±0.5%D |
±0.5%D |
-0.79mm~+2.38mm |
<±0.1%T |
<±0.1%T |
±1.6mm |
|
Wall thickness |
±10.0%T |
D<508mm, ±12.5%T |
-8%T~+19.5%T |
<-12.5%T |
-8%T~+19.5%T |
5.0mm |
|
D>508mm, ±10.0%T |
T≥15.0mm, ±1.5mm |
|||||
application
-
Due to their high bearing capacity and wide range of specifications, our LSAW pipes are widely used in:
-
Oil and gas transportation: The main pipelines for crude oil, natural gas, and refined oil products rely on their high-pressure capacity, reliable welds, and corrosion resistance to ensure safety.
-
Structural engineering: Deep foundation support piles for large buildings, bridge foundations and piers, conduit racks and pile legs for offshore oil and gas platforms, providing strong support.
-
Water infrastructure: Urban and regional large-diameter trunk water supply pipelines, large-scale drainage/sewerage pipeline systems to meet the high flow and long-term service requirements.
-
Mining and Energy: Long-distance slurry/tailings transportation pipelines for mines, pressure steel pipes for hydroelectric power plants, and water diversion tunnel liners to cope with high abrasion and high water pressure environments.
-
Urban construction: subway tunnel shield tube sheet connection/lining, ultra-high-rise building deep foundation pit ring support structure, to ensure the structural safety and stability of underground engineering.

WHAT DO YOU WANT TO KNOW
1. What are advantages compared to other competitors?
A: Resource integration and supply chain capabilities are our core strengths. We offer a wide range of product specifications and numerous product types. At the same time, our inventory and processing capabilities ensure the fastest delivery times. We also provide professional customized solutions and comprehensive.
-
+ -
2. Can I request to change the form of packaging and transportation?
A: Yes, We can change the form of the packaging and transportation according to your request, but you have to bear their own costs incurred during this period and the spreads.
-
+ -
3. Can I get free samples?
A: Yes, we can provide you the free samples, but you need to bear their own delivery costs.
-
+ -
4. Can I have my own Logo on the product?
A: Yes, you can send us your drawing and we can make your logo, but you have to bear their own the cost.
-
+ -
5. Can you produce the products according to my own drawings?
A: Yes, we can produce the products according to your drawings that will be most satisfy you.